Proposal for Reducing Electricity Costs for the Melting Furnace
No need for water cooling cables, making maintenance a breeze! Can be integrated with the furnace body.
The Aimeks melting furnace does not require water-cooled cables and is approximately 30% more energy-efficient compared to conventional products. In the case of a typical 60 kW unit, operating for 4 hours consumes 240 kW/H. With our unit, it can be reduced by 30%, so 40 kW is sufficient. For a 40 kW unit, operating for 4 hours consumes 160 kW/H, resulting in a difference of 80 kW/H. Additionally, due to its compact design, it can be integrated with the furnace body. Please feel free to contact us if you have any inquiries. 【Features】 - Compact design allows for integration with the furnace body - No need for water-cooled cables, making maintenance easy - Reduction in cooling water usage *For more details, please refer to the PDF document or feel free to contact us.
- Company:アイメックス 本社
- Price:Other